摘要: 为探讨工程生命周期上不同角色间以BIM合作可能会遭遇到的风险,本研究经由文献回顾及专家访谈整理出各角色间以BIM合作之四大风险构面及十七项风险因子,以问卷调查方式收集业界看法,并将问卷结果以层级分析法(AHP)进行分析,透过全体参与者与不同角色两种分析模式评估风险,并将结果与过去研究进行比较。
结果显示,全体参与者模式之下,“契约规范”构面为关键风险构面,接着将风险因子以累积权重达七成的筛选条件进行筛选,求得八项关键风险因子,依序为“契约BIM作业规范不明确”、“验收标准不一”、“协同作业厂商能力不足”、“整合性人才培养不易”、“BIM技术服务厂商选择困难”、“工作与管理模式改变”、“风险权责问题”与“上级主管支持度不足”,其中“协同作业厂商能力不足”、“BIM技术服务厂商选择困难”与“风险权责问题”属于外部风险因子(协同作业相关风险因子),其余为内部风险因子。
此外,将研究结果与过往文献比较讨论,发现有三项风险为持续存在,分别是契约、人才与上级支持度问题。本研究并有对上述关键风险因子提出建议,望能帮助推动各角色间以BIM协同合作,降低其风险。
The purpose of this study is to explore the risk of cooperation when using BIM among different parties of AEC industry. This study identified seventeen risk factors, which can be classified into four facets, among different parties during the cooperation of the BIM project. By using questionnaires and AHP method, two kinds of analysis model, including “all participants” and “different parties of AEC industry”, was conducted to assess the risks.
Through the analysis of the questionnaire, in “all participants” module, the key risk facet is “contract specification”. According to the cumulative weight percentage, which meet the criteria 70%, this study separates eight key risk factors, which are “BIM contract incomplete”, “different acceptance of BIM model”, “collaboration partner’s insufficient ability”, “the difficulty of training people”, “the difficulty of choosing BIM service provider”, “the change of operating procedures”, “Risk of responsibility” and “higher level does not support”. In eight key risk factors, which are mentioned above, three of them are external factors (collaboration risk factor) - “collaboration partner’s insufficient ability”, “the difficulty of choosing BIM service provider” and “Risk of responsibility”, the rest are internal factors.
Furthermore, by comparing the results with references, this study finds out there are three risk factors persist (means mentioned by the literatures), which are “contract issues”, “insufficient of trained people” and “higher level does not support”. This research provides some suggestions for the key risk factors to improve the cooperation of different parties of AEC Industry.