完整後設資料紀錄
DC 欄位語言
dc.contributor.authorLiao, DYen_US
dc.contributor.authorWang, CNen_US
dc.date.accessioned2014-12-08T15:38:46Z-
dc.date.available2014-12-08T15:38:46Z-
dc.date.issued2004-08-01en_US
dc.identifier.issn0894-6507en_US
dc.identifier.urihttp://dx.doi.org/10.1109/TSM.2004.831533en_US
dc.identifier.urihttp://hdl.handle.net/11536/26527-
dc.description.abstractThis paper deals with lot delivery estimates in a 300-mm automatic material handling system (AMHS), which is composed of several intrabay loops. We adopt a neural network approach to estimate the delivery times for both priority and regular lots. A network model is developed for each intrabay loop. Inputs to the proposed neural network model are the combination of transport requirements, automatic material handling resources, and ratios of priority lots against regular ones. A discrete-event simulation model based on the AMHS in a local 300-mm fab is built. Its outputs are adopted for training the neural network model with the back propagation method. The outputs of the neural network model are the expected delivery times of priority and regular lots in the loop, respectively. For a lot to be transported, its expected delivery time along a potential delivery path is estimated by the summation of all the loop delivery times along the path. A shortest path algorithm is used to find the path with the shortest delivery time among all the possible delivery paths. Numerical experiments based on realistic data from a 300-mm fab indicate that this neural network approach is sound and effective for the prediction of average delivery times. Both the delivery times for priority and regular lots get improved. Specially, for the cases of regular lots, our approach dynamically routes the lots according to the traffic conditions so that the potential blockings in busy loops can be avoided. This neural network approach is applicable to implementing a transport time estimator in dynamic lot dispatching and fab scheduling functions in realizing fully automated 300-mm manufacturing.en_US
dc.language.isoen_USen_US
dc.subjectAMHSen_US
dc.subjectneural networken_US
dc.subjectprioritized serviceen_US
dc.subject300-mm semiconductor manufacturingen_US
dc.titleNeural-network-based delivery time estimates for prioritized 300-mm automatic material handling operationsen_US
dc.typeArticleen_US
dc.identifier.doi10.1109/TSM.2004.831533en_US
dc.identifier.journalIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURINGen_US
dc.citation.volume17en_US
dc.citation.issue3en_US
dc.citation.spage324en_US
dc.citation.epage332en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000223187900014-
dc.citation.woscount14-
顯示於類別:期刊論文


文件中的檔案:

  1. 000223187900014.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。