完整後設資料紀錄
DC 欄位語言
dc.contributor.authorChang, SHen_US
dc.contributor.authorPai, PFen_US
dc.contributor.authorYuan, KJen_US
dc.contributor.authorWang, BCen_US
dc.contributor.authorLi, RKen_US
dc.date.accessioned2014-12-08T15:40:19Z-
dc.date.available2014-12-08T15:40:19Z-
dc.date.issued2003-09-11en_US
dc.identifier.issn0925-5273en_US
dc.identifier.urihttp://dx.doi.org/10.1016/S0925-5273(03)00121-Xen_US
dc.identifier.urihttp://hdl.handle.net/11536/27531-
dc.description.abstractTwo distinct types of semiconductor plants in Taiwan are integrated device manufacturing (IDM) plants and foundry plants. Most IDM plants are make-to-stock (MTS) operations, focusing on throughput and machine utilization. However, foundry plants are make-to-order (MTO) operations, focusing on due date and cycle time. Besides the challenge of different process technology, the mode of hybrid operation (a combination of MTO and MTS operations) is also a formidable task for these plants. This study develops a heuristic production activity control model to achieve the two different criteria in a hybrid wafer production environment. (C) 2003 Elsevier B.V. All rights reserved.en_US
dc.language.isoen_USen_US
dc.subjectwafer fabrication make-to-stocken_US
dc.subjectmake-to-orderen_US
dc.subjectproduction activity controlen_US
dc.subjecttheory of constraintsen_US
dc.titleHeuristic PAC model for hybrid MTO and MTS production environmenten_US
dc.typeArticle; Proceedings Paperen_US
dc.identifier.doi10.1016/S0925-5273(03)00121-Xen_US
dc.identifier.journalINTERNATIONAL JOURNAL OF PRODUCTION ECONOMICSen_US
dc.citation.volume85en_US
dc.citation.issue3en_US
dc.citation.spage347en_US
dc.citation.epage358en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000184714000007-
顯示於類別:會議論文


文件中的檔案:

  1. 000184714000007.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。