標題: Automatic schedule integration for highway projects
作者: Dzeng, RJ
Wang, WC
土木工程學系
Department of Civil Engineering
關鍵字: infrastructure management;construction scheduling;schedule integration;standardization;modularization
公開日期: 1-Jul-2003
摘要: The construction of a highway/expressway, which involves a complex combination of roads, bridges, and tunnels, is generally separated into several projects. Various contractors thus execute different projects and often apply differing scheduling practices. Since all projects involved in highway construction must be completed for the highway to be useful, the management of the various projects should preferably be integrated. To assist project controllers in schedule integration, this study proposes algorithms based on standardized codes and network modules. A computer system was also designed to help contractors use these modules for scheduling, and ultimately to let project controllers combine these schedules electronically. A questionnaire survey and industry feedback revealed the potential benefits of using the proposed algorithms for generating and integrating schedules, respectively. Contractors' computation capabilities must be improved before the proposed scheduling algorithms can be fully implemented. (C) 2003 Elsevier Science B.V. All rights reserved.
URI: http://dx.doi.org/10.1016/S0926-5805(03)00017-7
http://hdl.handle.net/11536/27779
ISSN: 0926-5805
DOI: 10.1016/S0926-5805(03)00017-7
期刊: AUTOMATION IN CONSTRUCTION
Volume: 12
Issue: 4
起始頁: 447
結束頁: 461
Appears in Collections:Articles


Files in This Item:

  1. 000183462000008.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.