标题: | 半导体双厂设计方案之评估 Evaluation of Dual-Fab Design Alternatives for Semiconductor Manufacturing |
作者: | 陈晓严 Chen, Show-Yen 巫木诚 Wu, Muh-Cherng 工业工程与管理学系 |
关键字: | 半导体制造;厂房设计;跨厂生产;群组技术;等候网路模式;Semiconductor manufacturing;Fab design;Cross-fab production;Group technology;Queuing network model |
公开日期: | 2009 |
摘要: | 本研究主要探讨在不同规模产出需求下,三种厂房设计方案的表现。三种方案分别为单一大厂房、功能完整双厂房以及功能分割双厂房。给定机台种类及数目,三种厂房设计方案主要差异在于厂房内机台设置方式不同。单一大厂房方案将所有相同种类的机台置放一起形成一个工作站,并且将所有工作站设置在单一厂房中。功能完整双厂房方案将各种类相同的机台分成两个工作站,两工作站个别设置在两个较小的厂房,两厂皆具备所有种类的工作站,因此定义为功能完整的双厂房。相反地,功能分割双厂房则是将相同种类的机台置放一起形成一个工作站,将所有种类的工作站分成两群,各工作群分别设置到两小厂,两厂房内工作站不重复且无法独立完成产品。本研究将利用等候网路模式来求解厂房设计方案的机台组合,并利用此模式为绩效评估工具,评估三种厂房设计方案的表现。在所假设的利润成本资讯下,实验结果显示单一大厂方案适合在小规模产出情境,功能完整双厂房方案适合在大规模产出情境,而功能分割双厂房方案则适合中规模产出情境。 This research examines three design alternatives for semiconductor fabs in order to compare their effectiveness under various scales of throughput requirements. The three design alternatives are respectively called single large fab (SL-fab), two functionally-comprehensive fabs (TFC-fab), and two functionally-disjoint fabs (TFD-fab). Given a particular set of machine types and numbers, the three design alternatives use different methods in the decisions of physically locating these machines. In the SL-fab alternative, all machines of each type are placed in a workstation and all workstations are located in a single fab. In the TFC-fab alternative, all machines of each type are grouped into two workstations, each of which as a result is functionally identical and respectively placed in one of two smaller fabs. In contrast, the TFD-fab alternative, all machines of each type are placed in a workstation but all workstations are grouped into two categories, and each category is placed in one of two smaller fabs. Queuing network models are used to design the machine mix for and evaluate the effectiveness of the three design alternatives. Experiment results indicate that the SL-fab alternative is most suitable for small-scale throughput, the TFD-fab alternative is most suitable for mid-scale throughput, while the TFC-fab alternative might be most suitable for very large-scale throughput. Surely, ranges of the three-level scales of throughput depend upon how we make the assumptions about the revenue and cost information. |
URI: | http://140.113.39.130/cdrfb3/record/nctu/#GT079733513 http://hdl.handle.net/11536/45418 |
显示于类别: | Thesis |
文件中的档案:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.