完整後設資料紀錄
DC 欄位語言
dc.contributor.author王崇洋en_US
dc.contributor.authorWang, Chong-Yangen_US
dc.contributor.author陳安斌en_US
dc.contributor.author李慶恩en_US
dc.contributor.authorChen, An-Binen_US
dc.contributor.authorLi, Qing-Enen_US
dc.date.accessioned2014-12-12T02:18:18Z-
dc.date.available2014-12-12T02:18:18Z-
dc.date.issued1996en_US
dc.identifier.urihttp://140.113.39.130/cdrfb3/record/nctu/#NT854396003en_US
dc.identifier.urihttp://hdl.handle.net/11536/62485-
dc.description.abstractProduction Scheduling is a tough program in many manufacture
firms. In past years, most articles which researched to solve
the complexity of production scheduling defined the product
environment was in an ideal situation, and tried simplize the
problem. As we know, in series ISO9000, the standard was
defined by terminate of estimation. These relative MRP systems
were to analysis output and to built the Production scheduling
by such as definition or to met the target formula of production
scheduling. InIn This research, we tying to use discrete system
simulation tools to operate with the practice management and
operation rule, to built a model of integrated simulation
scheduling to solve the production Scheduling problem of textile
Industry. This system will compare the result of real
experience scheduling with Gant diagram which developed by the
skill of simulation. By analysis the data of Ho-Yung Textile
line, this research has a excellent performance.
zh_TW
dc.language.isozh_TWen_US
dc.subject生產排程zh_TW
dc.subject半連續式zh_TW
dc.subject紡織工業zh_TW
dc.subject模擬zh_TW
dc.subject資訊zh_TW
dc.subject管理zh_TW
dc.subjectProduction Schedulingen_US
dc.subjectSemi-continuousen_US
dc.subjectTextile Industryen_US
dc.subjectSystem Simulationen_US
dc.subjectINFORAMTIONen_US
dc.subjectMANAGEMENTen_US
dc.titleSolving the Semi-continuous Production Scheduling Problem by Using System Simulation—A Case Study of Textile Industryzh_TW
dc.typeThesisen_US
dc.contributor.department資訊管理研究所zh_TW
顯示於類別:畢業論文