完整后设资料纪录
DC 栏位 | 值 | 语言 |
---|---|---|
dc.contributor.author | 李欣运 | en_US |
dc.contributor.author | Hsin-Yun Lee | en_US |
dc.contributor.author | 曾仁杰 | en_US |
dc.contributor.author | Ren-Jye Dzeng | en_US |
dc.date.accessioned | 2014-12-12T02:19:54Z | - |
dc.date.available | 2014-12-12T02:19:54Z | - |
dc.date.issued | 1998 | en_US |
dc.identifier.uri | http://140.113.39.130/cdrfb3/record/nctu/#NT870015054 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/63758 | - |
dc.description.abstract | 工程进度规划是营建工程专案执行顺利与否的重要关键之一。随着工程专案逐渐地巨型化与复杂化,进度工程师所规划的进度网图难免会有笔误、矛盾甚至不合法规的错误发生。由于进度网图错综复杂,这些错误往往却难以透过人力去核对确认。本研究透过文献回顾、专家访谈与实际观察等三种知识撷取方式,对高层建筑工程进度规划的相关专家知识作完整的归纳与分析,并依其原因与目的、立场观点以及评核型态等三方面分类探讨之。有别于过去的知识库建立方式,本研究建立排程评核法则之一般化叙述模式,以物件导向形式纪录专家知识。此外,系统使用者亦可自行建立符合个人要求与需求的排程评核法则。本研究亦依据所建立之评核法则一般化模式,建立电脑自动评核系统 - ScheduleCoach。该系统以法则式推理的方式对工程进度规划各部分的属性资料作自动评核。ScheduleCoach 系统对于不符合评核法则的作业项目、作业关系或使用资源,引用案例式推理的方式经过检验与修正之后提出排程修正建议,供进度规划者作为修改的参考。 | zh_TW |
dc.description.abstract | Planning and scheduling is one of the key factors to the success of a construction project. Because of the increasing complexity and size of construction projects nowadays, pre-construction schedules tend to comprise a large number of activities and much related information. These schedules often contain unintentional errors and conflicts, and those due to the lack of experience. These mistakes need to be corrected, and often they can be corrected easily by an experience scheduler. However, due to the number of activities involved, sometimes these mistakes are hard to be found.With the increasing power and decreasing cost, personal computers have become a common tool used by construction experts to facilitate their daily decisions such as scheduling, cost estimation, and cash flow analysis. This research applies artificial intelligence techniques (i.e., case-based reasoning and rule-based reasoning) and develops a computer system called ScheduleCoach, which can analyze a computerized schedule and provide corrective advises. The current knowledge base of the system focuses on high-rise building construction. | en_US |
dc.language.iso | zh_TW | en_US |
dc.subject | 排程 | zh_TW |
dc.subject | 专家系统 | zh_TW |
dc.subject | 案例式推理 | zh_TW |
dc.subject | 法则式推理 | zh_TW |
dc.subject | schedule | en_US |
dc.subject | expert system | en_US |
dc.subject | case-based reasoning | en_US |
dc.subject | rule-based reasoning | en_US |
dc.title | 工程进度规划自动评核与建议系统架构之研究 | zh_TW |
dc.title | ScheduleCoach: An Automated Schedule Advisory System | en_US |
dc.type | Thesis | en_US |
dc.contributor.department | 土木工程学系 | zh_TW |
显示于类别: | Thesis |