标题: 不同排程组合下晶圆厂交期预测因子之研究
Predicting Due Dates under Various Combinations of Scheduling Rules in a Wafer Fabrication Factory
作者: 刘正祥
Jeng-Shiang Liou
沙永杰
D. Y. Sha
工业工程与管理学系
关键字: 晶圆制造;投料法则;派工法则;Wafer Fabrication;Releasing Rule;Dispatching Rule
公开日期: 2000
摘要: 制造系统中订单的完工时间,会受到许多因子所影响,如:订单特征、系统状态、…、等。这些因子对订单完工时间的影响程度,依生产作业控制策略(投料法则、派工法则)的不同而有所改变。对于不同投料法则与派工法则之排程组合,应挑选影响完工时间的显着因子来预测完工时间,进而设计应搭配之交期指派法则。
本研究首先将整理目前晶圆制造相关研究所使用过的投料法则、派工法则,挑选引用次数较高的法则纳入研究中。针对每一项投料法则与派工法则之排程组合,经由模拟工具与统计分析,过滤出影响订单完工时间的因子。利用逐步回归方法,发展每种排程组合应搭配之交期指派法则。
In a manufacturing system, completion time of an order is affected by many factors related to order characteristics and system status and is very difficult to predict accurately. Also, the level of influence of each factor on completion time of an order may depend on the production system characteristics, such as the releasing and dispatching rule used. Discussed in this paper are a method to identify factors that have significant effects on completion times of orders under various combinations of scheduling rules through computer simulation and statistics analyzes, then develop due date assignment rules.
The first step of the research is selecting releasing and dispatching rules that had more cited times in related research of wafer fabrication. Second, for each combination of scheduling rules combine simulation and statistics analyze to find out the effective predicted factors of completion times of orders. Third, for each combination of scheduling rules establish efficient due date assignment rules according to the effective factors through regression model to predict the due date of orders accurately.
URI: http://140.113.39.130/cdrfb3/record/nctu/#NT890031035
http://hdl.handle.net/11536/66516
显示于类别:Thesis