完整後設資料紀錄
DC 欄位語言
dc.contributor.authorPearn, W. L.en_US
dc.contributor.authorTai, Yu-Tingen_US
dc.contributor.authorLee, J. H.en_US
dc.date.accessioned2014-12-08T15:09:13Z-
dc.date.available2014-12-08T15:09:13Z-
dc.date.issued2009-07-01en_US
dc.identifier.issn1521-334Xen_US
dc.identifier.urihttp://dx.doi.org/10.1109/TEPM.2009.2022270en_US
dc.identifier.urihttp://hdl.handle.net/11536/7032-
dc.description.abstractIn the semiconductor industry, to enhance customer satisfactions and ability of quick responses, the development of cycle time estimation model is very important. Cycle time estimation is an essential planning basis, which has many applications, especially on the analyses of performance indexes, capacity planning, and the assignments of due dates. In this paper, we provide a statistical approach for cycle time estimation in semiconductor plastic ball grid array (PBGA) packaging factories. Due to today's fierce competitive environments in the semiconductor industry, planners involved in PBGA packaging factories need an approach to obtain estimated cycle times with different confidence to ensure the due date assignments more accurately. Therefore, upper confidence bounds of estimated cycle times at various confidence coefficients are also presented in this paper. We demonstrate the applicability of the proposed cycle time estimation model incorporating the upper confidence bounds by presenting a real-world example taken from a PBGA packaging shop floor in a semiconductor packaging factory located in the Science-Based Industrial Park in Hsinchu, Taiwan.en_US
dc.language.isoen_USen_US
dc.subjectCycle time estimationen_US
dc.subjectGamma distributionen_US
dc.subjectplastic ball grid arrayen_US
dc.titleStatistical Approach for Cycle Time Estimation in Semiconductor Packaging Factoriesen_US
dc.typeArticleen_US
dc.identifier.doi10.1109/TEPM.2009.2022270en_US
dc.identifier.journalIEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURINGen_US
dc.citation.volume32en_US
dc.citation.issue3en_US
dc.citation.spage198en_US
dc.citation.epage205en_US
dc.contributor.department工業工程與管理學系zh_TW
dc.contributor.departmentDepartment of Industrial Engineering and Managementen_US
dc.identifier.wosnumberWOS:000268039400010-
dc.citation.woscount2-
顯示於類別:期刊論文


文件中的檔案:

  1. 000268039400010.pdf

若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。