完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.author | 蘇泰盛 | en_US |
dc.contributor.author | Su, Tai-Sheng | en_US |
dc.contributor.author | 許錫美 | en_US |
dc.contributor.author | Hsu, Hsi-Mei | en_US |
dc.date.accessioned | 2014-12-12T02:48:14Z | - |
dc.date.available | 2014-12-12T02:48:14Z | - |
dc.date.issued | 2008 | en_US |
dc.identifier.uri | http://140.113.39.130/cdrfb3/record/nctu/#GT009233814 | en_US |
dc.identifier.uri | http://hdl.handle.net/11536/77143 | - |
dc.description.abstract | 本論文探討有交期限制的多次投料問題:首先探討生產週期時間具不確定性,單階段生產系統的多次投料問題;隨之探討二階段生產系統的多次投料問題。二階段生產系統在每個生產階段之後,皆設有檢驗站,在每個投料時點,藉由每個階段的良品在製品數量與未滿足的需求量,須同時決定各階段的投料量。本研究假設各階段產出的良品個數服從中斷式幾何分配,成本函數考慮設置成本、變動成本、成品存貨持有成本及缺貨成本四項。以最小生產成本為目標,提出最佳投料量的特性,基於此特性,來設計動態規劃演算法,以求解各階段的最佳投料量。針對二階段生產系統的多次投料問題,在需求量較大時,我們提出一個啟發式演算法,可以有效地求得滿意解。最後,藉由數值範例來觀察決策參數的特性與最佳投料量的特性。 | zh_TW |
dc.description.abstract | In this study, we examine two issues of multiple lot-sizing problem with interrupted geometric yield and non-rigid demand. Firstly, we investigate a single-stage multiple lot-sizing problem with variable production lead-time. Secnodly, we investigate a two-stage multiple lot-sizing problem with simultaneously determining the optimal lot sizes for the two production stages in each period. The following cost items are considered in these problems: setup cost, variable production cost, inventory holding cost, and shortage cost. These problems are formulated as a dynamic program (DP), respectively, and some lemmas are proposed to confine their solution spaces. We propose a heuristic solution method to solve the two-stage multiple lot-sizing problem for reducing the computational time. Finally, numerical examples are illustrated to shown the efficiences of the proposed heuristic method. | en_US |
dc.language.iso | zh_TW | en_US |
dc.subject | 批量 | zh_TW |
dc.subject | 中斷式幾何分配 | zh_TW |
dc.subject | 動態規劃 | zh_TW |
dc.subject | 生產/存貨系統 | zh_TW |
dc.subject | Lot-sizing | en_US |
dc.subject | Interrupted geometric distribution | en_US |
dc.subject | Dynamic programming | en_US |
dc.subject | Production/Inventory system | en_US |
dc.title | 多次投料問題在中斷式幾何分配下之研究 | zh_TW |
dc.title | Multiple Lot Sizing Decisions with Interrupted Geometric Yield | en_US |
dc.type | Thesis | en_US |
dc.contributor.department | 工業工程與管理學系 | zh_TW |
顯示於類別: | 畢業論文 |