Title: Long-term tool elimination planning for a wafer fab
Authors: Chung, Shu-Hsing
Hsieh, Ming-Hsiu
工業工程與管理學系
Department of Industrial Engineering and Management
Keywords: tool portfolio;capacity planning;semiconductor
Issue Date: 1-Apr-2008
Abstract: Wafer manufacturers must make decisions regarding tool elimination due to changes caused by demand, product mixes, and overseas fab capacity expansion. Such a problem is raised by leading semiconductor manufacturers in Taiwan. This paper is aimed at developing a sound mechanism for tool portfolio elimination based on determining which equipment can be pruned. In the proposed mechanism, product mix, wafer output, capital expenditure, tool utilization, protective capacity, and cycle time are taken into the overall evaluation. This paper develops an integer programming model to avoid trial-and-error and to obtain the optimal solution. Compared to the current industry approach, the results show that the proposed mechanism can effectively identify the correct tools for elimination with a large capital savings and little cycle time impact. (C) 2007 Elsevier Ltd. All rights reserved.
URI: http://dx.doi.org/10.1016/j.cie.2007.09.009
http://hdl.handle.net/11536/9489
ISSN: 0360-8352
DOI: 10.1016/j.cie.2007.09.009
Journal: COMPUTERS & INDUSTRIAL ENGINEERING
Volume: 54
Issue: 3
Begin Page: 589
End Page: 601
Appears in Collections:Articles


Files in This Item:

  1. 000254157500018.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.