標題: Scheduling integrated circuit assembly operations on die bonder
作者: Pearn, W. L.
Chung, S. H.
Lai, C. M.
工業工程與管理學系
Department of Industrial Engineering and Management
關鍵字: integer programing;integrated circuit JQ assembly and packaging (ICASP);parallel machine scheduling;thin small outline package (TSOP)
公開日期: 1-Apr-2007
摘要: Solving the integrated circuit (IC) assembly scheduling problem (ICASP) is a very challenging task in the IC manufacturing industry. In the IC assembly factories, the jobs are assigned processing priorities and are clustered by their product types, which must be processed on groups of identical parallel machines. Furthermore, the job processing time depends on the product type, and the machine setup time is sequentially dependent on the orders of jobs processed. Therefore, the ICASP is more difficult to solve than the classical parallel machine scheduling problem. In this paper, we describe the ICASP in detail and formulate the ICASP as in integer programing problem to minimize the total machine workload. An efficient heuristic algorithm is also proposed for solving large-scale problems.
URI: http://dx.doi.org/10.1109/TEPM.2007.899091
http://hdl.handle.net/11536/10971
ISSN: 1521-334X
DOI: 10.1109/TEPM.2007.899091
期刊: IEEE TRANSACTIONS ON ELECTRONICS PACKAGING MANUFACTURING
Volume: 30
Issue: 2
起始頁: 97
結束頁: 105
Appears in Collections:Articles


Files in This Item:

  1. 000247786300001.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.