標題: | Tool planning in the scenario of multiple existing semiconductor fabs |
作者: | Wu, MC Hsiung, Y Hsu, HM 工業工程與管理學系 Department of Industrial Engineering and Management |
關鍵字: | capacity planning;cycle time;genetic algorithm;tool planning |
公開日期: | 1-十一月-2005 |
摘要: | The tool planning problem involves determining how many tools should be allocated to each tool group to achieve a set of objectives. Most previous studies assume that a demand mix has been given for a new factory to be planned. However, when a semiconductor company has several existing fabs, the demand mix for the new fab is not explicitly known, and needs to be allocated from the demand mix of the whole company. This paper presents an integrated approach to determine the optimal demand mix and associated tool plan for the new fab that can minimize the tool cost of the new fab while each fab (new or existing) is requested to meet a predefined target in its mean cycle time. Simulation experiments indicate that the proposed solution is better than that obtained by a heuristic method used in industry. The saving in tool cost for a typical tool planning problem can be over US$ 70 million. |
URI: | http://dx.doi.org/10.1007/s00170-004-2152-1 http://hdl.handle.net/11536/13144 |
ISSN: | 0268-3768 |
DOI: | 10.1007/s00170-004-2152-1 |
期刊: | INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY |
Volume: | 27 |
Issue: | 1-2 |
起始頁: | 145 |
結束頁: | 151 |
顯示於類別: | 期刊論文 |