dc.contributor.author許天淳en_US
dc.contributor.authorXu, Tian-Chunen_US
dc.contributor.author鍾淑馨en_US
dc.contributor.authorZhong, Shu-Xingen_US
dc.date.accessioned2014-12-12T02:18:17Z-
dc.date.available2014-12-12T02:18:17Z-
dc.date.issued1996en_US
dc.identifier.urihttp://140.113.39.130/cdrfb3/record/nctu/#NT854031001en_US
dc.identifier.urihttp://hdl.handle.net/11536/62460-
dc.description.abstractMany scheduling approaches for generating effective schedules have been developed in the literature. However, if all the tasks of the resultant schedule can not be finished at the production control stage within the planning period, all the efforts of these are useless. Unfortunately, the management have to face unexpected disruptions in the shop, when implementing (1) how to adjust a schedule to be more robust; (2) how to derive the control priority order for each operation in the schedule, according to the extent of being deviated from the schedule; and (3) how to choose the operations for compression in order to force the orders which will be delayed to be on schedule again. This thesis presents the concept and the derivation of the float time for each operation in a schedule. By using the float times as measures, the approaches to solving the above problems are developed.zh_TW
dc.language.isozh_TWen_US
dc.subject排程zh_TW
dc.subject排程寬裕zh_TW
dc.subject穩健的排程zh_TW
dc.subject作業壓縮zh_TW
dc.subject生產控制zh_TW
dc.subject工業工程zh_TW
dc.subject工程zh_TW
dc.subject管理學zh_TW
dc.subjectschedulingen_US
dc.subjectfloat timeen_US
dc.subjectrobust scheduleen_US
dc.subjectoperation compressionen_US
dc.subjectproduction controlen_US
dc.subjectINDUSTRIAL-ENGINEERINGen_US
dc.subjectENGINEERINGen_US
dc.subjectMANAGEMENTen_US
dc.title運用作業寬裕達成既定排程期望目標之研究zh_TW
dc.titleThe design of using float times to fulfill the target of a predetermined scheduleen_US
dc.typeThesisen_US
dc.contributor.department工業工程與管理學系zh_TW