標題: | Multiple lot-sizing decisions with an interrupted geometric yield and variable production time |
作者: | Hsu, Hsi-Mei Su, Tai-Sheng Wu, Muh-Cherng Huang, Liang-Chuan 工業工程與管理學系 Department of Industrial Engineering and Management |
關鍵字: | Lot-sizing;Interrupted geometric distribution;Dynamic programming;Production lead-time;Production/inventory system |
公開日期: | 1-Oct-2009 |
摘要: | This study examines a multiple lot-sizing problem for a single-stage production system with an interrupted geometric distribution, which is distinguished in involving variable production lead-time. In a finite number of setups, this study determined the optimal lot-size for each period that minimizes total expected cost. The following cost items are considered in optimum lot-sizing decisions: setup cost, variable production cost, inventory holding cost, and shortage cost. A dynamic programming model is formulated in which the duration between current time and due date is a stage variable, and remaining demand and work-in-process status are state variables. This study then presents an algorithm for solving the dynamic programming problem. Additionally, this study examines how total expected costs of optimal lot-sizing decisions vary when parameters are changed. Numerical results show that the optimum lot-size as a function of demand is not always monotonic. (C) 2009 Elsevier Ltd. All rights reserved. |
URI: | http://dx.doi.org/10.1016/j.cie.2009.01.014 http://hdl.handle.net/11536/6633 |
ISSN: | 0360-8352 |
DOI: | 10.1016/j.cie.2009.01.014 |
期刊: | COMPUTERS & INDUSTRIAL ENGINEERING |
Volume: | 57 |
Issue: | 3 |
起始頁: | 699 |
結束頁: | 706 |
Appears in Collections: | Articles |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.