標題: 建築工程套圖作業之案例研究
Investigation of the process of composing shop
作者: 張美苓
Mei - Ling Chang
王維志
Wei - Chih Wang
工學院工程技術與管理學程
關鍵字: 建築工程;套圖;自主檢查;The diagram of the construction engineering;set;independence checks
公開日期: 2007
摘要: 摘 要 建築工程之圖說數量及種類繁多,需由多位繪圖員共同完成,然因繪圖員之建築立體觀念及專業能力不同,因此常發生圖說尺寸及內容無法對應情況,故於施工前需先進行套圖作業。本研究首先,將施工圖說之實務套圖流程作為說明,並回顧台北市某甲級營造廠,其建築工程施工圖之套圖錯誤態樣,其次,對於常見套圖錯誤態樣提出基本處理建議,常見套圖錯誤態樣中之最具關鍵之套圖錯誤態樣有:高程不符、尺寸錯誤、CAD圖檔圖層錯誤、裝修收頭、圖說與標單不一致、修正不完全、傳遞修正、修改訊息傳遞不完全等七項;基本處理建議如:(一)圖面疑問之處理,透過繪圖工程師不定時至工地,可及時溝通解決,或者適時討論圖說尺寸。(二)將現有之工程文件(建築、結構、機電等發包圖,相關工程施工說明及材料規範,裝修圖及合約,工地會議紀錄)等資料詳讀。(三)透過清圖,整理圖說中之疑點及相關問題,將疑點及相關問題釐清並列表。(四)追蹤業主、建築師,主動提供建議方案,以加速解決問題。(五)材料訂貨前,再確認圖面尺寸正確否,並告知製作廠商。(六)輕隔間施作前須先確認圖說版次。(七)鋁門窗開口尺寸須三級管控,承辦不宜更換,或須交接明確。(八)每週工地會議紀錄,須給予各相關單位、人員會簽,以防遺漏重要事項,共八項處理建議等,進而建立套圖自主檢查項目,以提供建築工程營造單位,在處理套圖錯誤問題時之參考,期以減少處理作業時程,發揮套圖作業效益。
ABSTRACT The diagram of construction engineering says amount and category are numerous and need is together completed by several illustrators, however because of illustrator of construct stereoscopic idea and professional ability different, therefore often diagram happen to say size and content can't to in response to the condition, past at the construction ago need advanced set diagram homework in the line.The origin studies first and say construction diagram of the actual situation set diagram process is an explanation, and look back certain first grade construction company in Taipei City, the set of its construction engineering construction diagram Tai kind with false diagram, put forth a basic processing suggestion to the familiar set Tai kind with false diagram secondly, familiar set it has the set Tai kind with false diagram of keys to have most in the middle of the Tai kind with false diagram:Gao Cheng2 not agrees with, size mistake, CAD diagram file diagram layer mistake, repair to accept head, diagram to say and mark list inconformity, revise incompletion, deliver correction and modify a message to deliver incompletely etc.7;The basic processing suggests as:(A)The processing of chart question, through the painting not certain of engineer go to workplace, the communication solve, or discusses in good time that the diagram says size while being within the reach of.(Two)Existing engineering document(building and structure, machine electricity's etc. send report diagram, related explanation of the engineering construction and material standard and repair diagram and contract, workplace the minutes) etc. data detailed read.(Three)Through the pure diagram, tidy up diagram to say medium doubtful point and related problem, distinguish doubtful point and related problem to be juxtaposed form.(Four)Track owner, architect, provide to suggest a project on one's own initiative, work out a problem by acceleration.(Five)Before material orders, confirm chart size again the exactitude deny, and tell the manufacture the manufacturer.(Six)Light box stall made to must confirm diagram first to say a version time ago.(Seven)The aluminum doors and windows openings size must x-rated control, contracting for job should not change, or must hand over to connect definitely.(Eight)Each workplace the minutes, must
URI: http://140.113.39.130/cdrfb3/record/nctu/#GT009470523
http://hdl.handle.net/11536/82555
顯示於類別:畢業論文