標題: | Route planning for two wafer fabs with capacity-sharing mechanisms |
作者: | Wu, Muh-Cherng Chen, Chen-Fu Shih, Chang-Fu 工業工程與管理學系 Department of Industrial Engineering and Management |
關鍵字: | operations management;operations strategy;operations planning |
公開日期: | 2009 |
摘要: | This paper formulates and solves a route planning problem for semiconductor manufacturing. In order to quickly respond to rising demand, a semiconductor company usually adopts a dual-fab strategy to expand capacity. That is, two fab sites are built as neighbours and can easily share capacity. Through the capacity-sharing design, a product may be produced by a cross-fab route. That is, some operations of a product are carried out in one fab and the other operations in the other fab. This leads to a routing planning problem, which involves two decisions-determining the cut-off point of the cross-fab route and the route ratio for each product-in order to maximise the throughput subject to a cycle time constraint. An LP-GA method is proposed to solve the route planning problem. We first use the LP module to make the cut-off point decisions, and proceed to use the GA module for making the decision on the route ratio. Experimental results show that the LP-GA method significantly outperforms other methods. |
URI: | http://hdl.handle.net/11536/7808 http://dx.doi.org/10.1080/00207540802172029 |
ISSN: | 0020-7543 |
DOI: | 10.1080/00207540802172029 |
期刊: | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH |
Volume: | 47 |
Issue: | 20 |
起始頁: | 5843 |
結束頁: | 5856 |
Appears in Collections: | Articles |
Files in This Item:
If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.