Full metadata record
DC FieldValueLanguage
dc.contributor.author蔡青峰en_US
dc.contributor.authorChing-Feng Tsaien_US
dc.contributor.author黃台生en_US
dc.contributor.authorTai-Sheng Huangen_US
dc.date.accessioned2014-12-12T02:58:54Z-
dc.date.available2014-12-12T02:58:54Z-
dc.date.issued2005en_US
dc.identifier.urihttp://140.113.39.130/cdrfb3/record/nctu/#GT009336503en_US
dc.identifier.urihttp://hdl.handle.net/11536/79600-
dc.description.abstract本研究主要探討固定式閉塞區間號誌系統(Fixed Block Signaling System,以下簡稱FBS)與移動式閉塞區間號誌系統(Moving Block Signaling System,以下簡稱MBS)控制方式下,相關因素(區間長度、最高速限、警戒速限、曲率半徑、信標位置及停站時間等)對運能之影響關係。
本研究藉由文獻回顧及資料收集瞭解捷運FBS與MBS之控制方式與運作原理。隨後以台北捷運高運量圓山至劍潭路段為模擬系統基礎,利用Java Script程式語言開發FBS模擬模式與MBS模擬模式,透過所開發之模擬模式分別進行影響FBS與MBS最小班距相關因素模擬實驗,並將最小班距轉換為最大運能後,比較FBS與MBS之運能差異,最後透過SPSS 10.0分析並建立其迴歸方程式。
模擬實驗結果顯示,MBS最小班距較一般FBS最小班距縮短20秒,路線運能每單位小時可提升12列車單位;本研究實驗之相關影響因素中,僅區間長度、最高速限、曲率半徑及停站時間對FBS運能影響較為顯著,僅停站時間對MBS運能影響較為顯著。
zh_TW
dc.description.abstractThe study discussed the effects on the factors which were related to the line capacity (including block length, maximum speed, caution speed, curvature radius, beacon location and dwell time) under fixed block signaling system (FBS) and moving block signaling system (MBS).
The study stated the control methods and operation principles of FBS and MBS, FBS simulation model and MBS simulation model, minimum headway and maximum line capacity of FBS and MBS, regression formulas of FBS and MBS. The control methods and operation principles of FBS and MBS via paper review and data collection; FBS simulation model and MBS simulation model were developed by java script programming language, and the simulation system was based on Taipei MRT heavy-capacity transit system Yuanshan to Jiantan section of Danshui line; The minimum headway was gained via simulation model application, and was transferred to maximum line capacity, then compared the MBS line capacity to FBS; Regression formulas were analyzed and constructed by SPSS v10th.
The results revealed that MBS shortened 20 seconds minimum headway and increased 12 train units per hour; the factors in the study only block length, maximum speed, curvature radius and dwell time were notable on FBS line capacity; and only dwell time was notable on MBS line capacity.
en_US
dc.language.isozh_TWen_US
dc.subject捷運zh_TW
dc.subject固定式閉塞區間zh_TW
dc.subject移動式閉塞區間zh_TW
dc.subject最小班距zh_TW
dc.subject運能zh_TW
dc.subjectMRTen_US
dc.subjectFixed Blocken_US
dc.subjectMoving Blocken_US
dc.subjectMinimum Headwayen_US
dc.subjectLine Capacityen_US
dc.title捷運固定閉塞區間與移動閉塞區間運能比較之研究zh_TW
dc.titleA Comparison of Line Capacity for Mass Rapid Transit System between Fixed Block System and Moving Block Systemen_US
dc.typeThesisen_US
dc.contributor.department運輸與物流管理學系zh_TW
Appears in Collections:Thesis


Files in This Item:

  1. 650301.pdf
  2. 650302.pdf
  3. 650303.pdf
  4. 650304.pdf
  5. 650305.pdf
  6. 650306.pdf

If it is a zip file, please download the file and unzip it, then open index.html in a browser to view the full text content.